Triple

T11322053
Position Surface form Disambiguated ID Type / Status
Subject Electric Multiple Unit E268117 entity
Predicate instanceOf P0 FINISHED
Object multiple unit C29558 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multiple unit
Context triple: [Electric Multiple Unit, instanceOf, multiple unit]
  • A. multi-family residential property
    A multi-family residential property is a single real estate asset containing multiple separate housing units, such as duplexes, townhomes, or apartment buildings, designed to accommodate more than one household.
  • B. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • C. single-family house
    A single-family house is a standalone residential building designed to be occupied by one household, typically featuring private living spaces, a kitchen, bathrooms, and often a yard or garden.
  • D. mixed-use skyscraper complex
    A mixed-use skyscraper complex is a vertically integrated high-rise development that combines residential, commercial, office, and often recreational or civic functions within a unified architectural and infrastructural framework.
  • E. single
    A single is an individual who is not currently in a romantic or marital relationship, often living independently and making personal decisions without a partner’s involvement.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaca5c24819083db46a30d86cb34 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:32 p.m.