Triple

T11321524
Position Surface form Disambiguated ID Type / Status
Subject Mumbai Central E268103 entity
Predicate isLocatedOnCorridor P5520 FINISHED
Object Mumbai–Delhi route E458444 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mumbai–Delhi route | Statement: [Mumbai Central, isLocatedOnCorridor, Mumbai–Delhi route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mumbai–Delhi route
Context triple: [Mumbai Central, isLocatedOnCorridor, Mumbai–Delhi route]
  • A. Mumbai–Pune route
    The Mumbai–Pune route is a major transport corridor in western India connecting the cities of Mumbai and Pune, known for passing through the scenic hill station region of Lonavala.
  • B. Mumbai–Ahmedabad route
    The Mumbai–Ahmedabad route is a major rail and transport corridor in western India connecting the metropolitan cities of Mumbai and Ahmedabad.
  • C. Delhi–Saharanpur route
    The Delhi–Saharanpur route is a key railway corridor in northern India connecting the national capital region with the city of Saharanpur via important junctions such as Meerut.
  • D. Hyderabad–Bangalore route
    The Hyderabad–Bangalore route is a major railway corridor in southern India connecting the cities of Hyderabad in Telangana and Bangalore in Karnataka, passing through key intermediate stations such as Mahbubnagar.
  • E. Delhi–Mumbai (via Ratlam) trunk route chosen
    The Delhi–Mumbai (via Ratlam) trunk route is a major Indian Railways corridor connecting the national capital with the financial capital through central-western India, carrying heavy passenger and freight traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaca5c24819083db46a30d86cb34 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e9dff37081909622623e66e17ccd completed April 9, 2026, 6:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69e543055b588190a417b3d50ade989a completed April 19, 2026, 9:03 p.m.
Created at: April 8, 2026, 9:32 p.m.