Triple
T11313485
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Autoroute A9 |
E267901
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Autoroute A7 |
E254641
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autoroute A7 | Statement: [Autoroute A9, connectsTo, Autoroute A7]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Autoroute A7 Context triple: [Autoroute A9, connectsTo, Autoroute A7]
-
A.
Autoroute A7
chosen
Autoroute A7 is a major French motorway in southeastern France that connects Lyon to Marseille and serves as a key route to the Mediterranean coast.
-
B.
Autoroute A6
Autoroute A6 is a major French motorway linking Paris to Lyon and serving as a key segment of the primary north–south route through France.
-
C.
Autoroute A5
Autoroute A5 is a major French motorway that connects the Paris region to the east of the country, serving as an important route toward Troyes and beyond.
-
D.
Autoroute A9
Autoroute A9 is a major French motorway in the south of France that links the Rhône valley to the Spanish border along the Mediterranean coast.
-
E.
Autoroute A3
Autoroute A3 is a short French motorway in the Île-de-France region that connects Paris to its northeastern suburbs and links with major routes such as the A1 and A86.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaca5c24819083db46a30d86cb34 |
completed | April 8, 2026, 7:21 p.m. |
| NER | Named-entity recognition | batch_69d7e9c1b7dc81908d8cc768c47390d3 |
completed | April 9, 2026, 6:02 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f12fa07fc081909a42f9c19ad38511 |
completed | April 28, 2026, 10:07 p.m. |
Created at: April 8, 2026, 9:32 p.m.