Triple

T11312911
Position Surface form Disambiguated ID Type / Status
Subject Elburn, Illinois E267885 entity
Predicate hasRailStation P726 FINISHED
Object Elburn station E178413 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Elburn station | Statement: [Elburn, Illinois, hasRailStation, Elburn station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Elburn station
Context triple: [Elburn, Illinois, hasRailStation, Elburn station]
  • A. Elburn station chosen
    Elburn station is a commuter rail station in Elburn, Illinois, serving as the western endpoint of Metra’s Union Pacific West Line to Chicago.
  • B. Lemont station
    Lemont station is a commuter rail stop in Lemont, Illinois, served by Metra’s Heritage Corridor line between Chicago and Joliet.
  • C. Naperville station
    Naperville station is a commuter rail station in Naperville, Illinois, serving as a major stop for Metra and Amtrak trains in the western suburbs of Chicago.
  • D. Waukegan station
    Waukegan station is a commuter rail station in Waukegan, Illinois, serving as a key stop and northern terminus for many Metra Union Pacific North Line trains between Chicago and the northern suburbs.
  • E. Glenbrook station
    Glenbrook station is a commuter rail stop in Stamford, Connecticut, served by Metro-North Railroad’s New Canaan Branch.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaca5c24819083db46a30d86cb34 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e9c1b7dc81908d8cc768c47390d3 completed April 9, 2026, 6:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69e50a910a2c8190b8afd4c988e64141 completed April 19, 2026, 5:02 p.m.
Created at: April 8, 2026, 9:32 p.m.