Triple
T11305168
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CEQA Guidelines in the California Code of Regulations |
E267696
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | implementing regulation of the California Environmental Quality Act |
C23776
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: implementing regulation of the California Environmental Quality Act Context triple: [CEQA Guidelines in the California Code of Regulations, instanceOf, implementing regulation of the California Environmental Quality Act]
-
A.
environmental regulation compilation
A curated collection of laws, policies, standards, and guidelines that govern human impacts on the environment, organized for reference, analysis, and compliance support.
-
B.
environmental governance instrument
An environmental governance instrument is a policy tool, mechanism, or institutional arrangement used by public or private actors to influence behaviors and decisions in order to protect, manage, or restore the environment.
-
C.
environmental impact assessment law
chosen
Environmental impact assessment law is the body of legal rules and procedures that requires proposed projects or policies to be evaluated for their potential environmental effects before approval or implementation.
-
D.
land-use control
Land-use control is the set of legal and administrative mechanisms by which governments and authorities regulate how land may be developed, used, and conserved within a given jurisdiction.
-
E.
spatial planning instrument
A spatial planning instrument is a formal tool, policy, or regulatory mechanism used by authorities to guide, control, and coordinate the use and development of land and space within a defined territory.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaca5c24819083db46a30d86cb34 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:32 p.m.