Triple
T11295723
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | City Island Bridge |
E267445
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fixed bridge |
C29507
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fixed bridge Context triple: [City Island Bridge, instanceOf, fixed bridge]
-
A.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
-
B.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
C.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
D.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
-
E.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac993a08190a6f36445ebaf9a43 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:32 p.m.