Triple
T11293366
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Palawa kani |
E267385
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned language |
C3652
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned language Context triple: [Palawa kani, instanceOf, planned language]
-
A.
language projection
Language projection is the process by which individuals attribute their own linguistic preferences, assumptions, or interpretations onto others, often shaping communication and understanding based on their personal language framework.
-
B.
reconstructed language
A reconstructed language is a hypothesized earlier form of a language or language family, systematically inferred by linguists from patterns in its descendant or related languages.
-
C.
language revitalization project
chosen
A language revitalization project is an organized, community-centered effort to document, teach, and promote the use of an endangered or marginalized language to ensure its continued transmission and everyday use.
-
D.
language creator
A language creator is an individual or system that designs and develops new languages, including their grammar, vocabulary, and usage rules, for communication, art, or specialized purposes.
-
E.
plan
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac993a08190a6f36445ebaf9a43 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:32 p.m.