Triple
T11291165
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PSLV-G |
E267326
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | variant of PSLV |
C2214
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: variant of PSLV Context triple: [PSLV-G, instanceOf, variant of PSLV]
-
A.
orbital launch vehicle
An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
-
B.
expendable launch vehicle
An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
-
C.
heavy-lift launch vehicle
A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
-
D.
expendable launch vehicle family
chosen
An expendable launch vehicle family is a series of related, single-use rockets designed to carry payloads into space and then be discarded after each mission.
-
E.
partially reusable launch vehicle
A partially reusable launch vehicle is a space launch system in which only some components—such as the first stage, boosters, or engines—are recovered and refurbished for multiple flights, while the remaining parts are expended.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac993a08190a6f36445ebaf9a43 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:32 p.m.