Triple
T11281772
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Golden Circle tourist route |
E267081
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sightseeing circuit |
C9983
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sightseeing circuit Context triple: [Golden Circle tourist route, instanceOf, sightseeing circuit]
-
A.
tourist excursion
chosen
A tourist excursion is a planned short-term trip or outing designed to provide travelers with leisure, sightseeing, cultural experiences, or recreational activities at one or more destinations.
-
B.
self-guided tour route
A self-guided tour route is a predefined path or itinerary that visitors follow independently, using provided materials or digital tools for information and navigation without a live guide.
-
C.
tourist attraction
A tourist attraction is a place, event, or feature that draws visitors due to its cultural, historical, natural, recreational, or entertainment value.
-
D.
inspection tour
An inspection tour is a planned visit or series of visits to facilities, sites, or operations to systematically examine conditions, verify compliance with standards, and identify issues or improvements.
-
E.
safari ride
A safari ride is a guided excursion, typically in an open vehicle, through wildlife habitats to observe animals in their natural environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac8c2f48190ad0596f1f89f0470 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:31 p.m.