Triple
T11242647
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Siasconset Bluff Walk |
E266108
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal footpath |
C2290
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal footpath Context triple: [Siasconset Bluff Walk, instanceOf, coastal footpath]
-
A.
long-distance footpath
A long-distance footpath is an extended, often waymarked walking route designed for multi-day journeys across varied landscapes, typically connecting towns, natural landmarks, or regions.
-
B.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
C.
walking path
chosen
A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
-
D.
rail trail
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
E.
recreation trail
A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac656d48190b275efaa7d6074ee |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:30 p.m.