Triple

T11234816
Position Surface form Disambiguated ID Type / Status
Subject Teesta V Hydroelectric Project E265914 entity
Predicate gridStabilizationRole P90839 FINISHED
Object peaking and grid support in the North Eastern region LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: peaking and grid support in the North Eastern region | Statement: [Teesta V Hydroelectric Project, gridStabilizationRole, peaking and grid support in the North Eastern region]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridStabilizationRole
Context triple: [Teesta V Hydroelectric Project, gridStabilizationRole, peaking and grid support in the North Eastern region]
  • A. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • B. powerplantRole
    Indicates that one entity serves in a specific functional or operational role relative to a power plant.
  • C. hasGridConnection
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • D. gridConnectionAgreementWith
    Indicates an agreement establishing the terms and conditions under which one party is connected to another party’s electrical grid.
  • E. gridConnectionPurpose chosen
    Indicates the intended role or function of a connection to an electrical grid within a system or network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e903b8ec81909f9c89776d35c650 completed April 9, 2026, 5:59 p.m.
PD Predicate disambiguation batch_69d75cfdf7a88190aae21572e57ef208 completed April 9, 2026, 8:02 a.m.
Created at: April 8, 2026, 9:30 p.m.