Triple
T11230740
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South African National Roads Agency Limited |
E265812
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road agency |
C26633
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road agency Context triple: [South African National Roads Agency Limited, instanceOf, road agency]
-
A.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
B.
road manager
chosen
A road manager is responsible for planning, coordinating, and overseeing the maintenance, safety, and efficient operation of road networks within a designated area.
-
C.
road traffic agreement
A road traffic agreement is a formal arrangement between parties—such as governments, municipalities, or private entities—that defines rights, responsibilities, and rules for the use, management, and regulation of road traffic within a specified area or network.
-
D.
toll road operator
A toll road operator is an entity responsible for managing, maintaining, and collecting user fees on designated roadways or bridges, often under government concession or private ownership.
-
E.
toll road
A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac656d48190b275efaa7d6074ee |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:30 p.m.