Triple

T11229401
Position Surface form Disambiguated ID Type / Status
Subject Litani River E265781 entity
Predicate hydroelectricPlant P9904 FINISHED
Object Awali power station E912599 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Awali power station | Statement: [Litani River, hydroelectricPlant, Awali power station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Awali power station
Context triple: [Litani River, hydroelectricPlant, Awali power station]
  • A. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • B. Markaba power station chosen
    Markaba power station is a hydroelectric facility in Lebanon that harnesses the flow of the Litani River to generate electricity.
  • C. Kiira Power Station
    Kiira Power Station is a major hydroelectric power plant on the Nile River in Uganda that significantly contributes to the country’s electricity generation.
  • D. Duvha Power Station
    Duvha Power Station is a large coal-fired power plant in South Africa that forms part of Eskom’s fleet supplying electricity to the national grid.
  • E. Vamma power station
    Vamma power station is a major hydroelectric power plant in Norway, harnessing the flow of the Glomma River to generate renewable energy.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac656d48190b275efaa7d6074ee completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e900fbcc8190a3177f8a73564433 completed April 9, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69e4cc4c630c8190a5e43c2108dfb50d completed April 19, 2026, 12:36 p.m.
Created at: April 8, 2026, 9:30 p.m.