Triple

T11222924
Position Surface form Disambiguated ID Type / Status
Subject Hernando County E265616 entity
Predicate traversedBy P225 FINISHED
Object U.S. Route 19 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 19 | Statement: [Hernando County, traversedBy, U.S. Route 19]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 19
Context triple: [Hernando County, traversedBy, U.S. Route 19]
  • A. U.S. Route 19 chosen
    U.S. Route 19 is a major north–south United States highway running from Erie, Pennsylvania, to Memphis, Florida, passing through several states in the eastern U.S.
  • B. U.S. Route 17
    U.S. Route 17 is a major north–south U.S. Highway running along the southeastern Atlantic coast, connecting cities from Florida to Virginia.
  • C. U.S. Route 18
    U.S. Route 18 is a major east–west United States highway that runs through the Midwest, connecting rural areas and regional centers across several states.
  • D. U.S. Route 14
    U.S. Route 14 is a major east–west U.S. Highway that runs from Chicago, Illinois, across the northern Midwest and Great Plains to Yellowstone National Park in Wyoming.
  • E. U.S. Route 13
    U.S. Route 13 is a major north–south U.S. Highway running along the East Coast, primarily through the Delmarva Peninsula, connecting cities from North Carolina to Pennsylvania.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aac59460819089b9848b27f57848 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e8ec8fb08190b27144ab65f85957 completed April 9, 2026, 5:59 p.m.
Created at: April 8, 2026, 9:30 p.m.