Triple
T11217169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Florida Air National Guard units |
E265468
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Air National Guard units |
C2497
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Air National Guard units Context triple: [Florida Air National Guard units, instanceOf, Air National Guard units]
-
A.
military unit
chosen
A military unit is an organized group of armed personnel structured under a defined command hierarchy to perform specific tactical or operational missions.
-
B.
U.S. Army sustainment command
The U.S. Army Sustainment Command is the organization responsible for providing logistics, supply, maintenance, and distribution support to ensure Army forces are equipped and sustained during training, deployment, and combat operations worldwide.
-
C.
U.S. Army battalion
A U.S. Army battalion is a mid-sized tactical unit, typically consisting of 300–1,000 soldiers organized into several companies, capable of independent operations under a battalion commander.
-
D.
United States Army signal brigade
A United States Army signal brigade is a specialized military unit responsible for planning, installing, operating, and maintaining tactical and strategic communications and information systems to support command and control across the battlefield.
-
E.
Air Force Sustainment Center (AFSC)
The Air Force Sustainment Center (AFSC) is a major U.S. Air Force organization responsible for providing depot maintenance, supply chain management, and sustainment support to ensure the readiness and availability of air and space weapon systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac59460819089b9848b27f57848 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:30 p.m.