Triple
T11213361
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tarutao Island |
E265365
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | national park island |
C445
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: national park island Context triple: [Tarutao Island, instanceOf, national park island]
-
A.
national park area
A national park area is a protected geographic region designated by a government to conserve natural landscapes, ecosystems, and wildlife while providing opportunities for public recreation and education.
-
B.
island
chosen
An island is a landmass completely surrounded by water, smaller than a continent and isolated from other substantial land areas.
-
C.
wildland park
A wildland park is a protected natural area managed primarily to conserve ecosystems and wildlife while providing low-impact recreational opportunities in a largely undeveloped landscape.
-
D.
interstate park
An interstate park is a protected natural or recreational area that spans the boundaries of two or more states and is jointly managed through cooperative agreements between those states.
-
E.
national park authority
A national park authority is a governmental or designated public body responsible for managing, protecting, and promoting the sustainable use and enjoyment of a country's national parks and their natural and cultural resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aac59460819089b9848b27f57848 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:30 p.m.