Triple
T11196754
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | R301 road |
E264942
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional route in South Africa |
C20428
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional route in South Africa Context triple: [R301 road, instanceOf, regional route in South Africa]
-
A.
road in South Africa
chosen
A road in South Africa is a constructed transportation route, ranging from national highways to local streets, designed to support vehicular and pedestrian movement while adhering to the country’s specific traffic laws, signage standards, and infrastructural conditions.
-
B.
spur route
A spur route is a short roadway that branches off from a main highway or route to provide direct access to a specific destination or area.
-
C.
spur route
A spur route is a short, secondary road or railway line that branches off from a main route to provide direct access to a specific location or area.
-
D.
transportation route
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
E.
province of South Africa
A province of South Africa is a primary administrative division of the country, each with its own government structures, geographic boundaries, and socio-economic characteristics under the national constitution.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9eb9248190b20211772621b4bc |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:29 p.m.