Triple
T11192524
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cape Lambert |
E264836
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | iron ore export port |
C452
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: iron ore export port Context triple: [Cape Lambert, instanceOf, iron ore export port]
-
A.
iron ore producer
An iron ore producer is a company or entity that extracts, processes, and supplies iron ore from mineral deposits for use in steelmaking and related industries.
-
B.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
-
C.
wood pellet export terminal
A wood pellet export terminal is a specialized port facility designed for the receipt, storage, handling, and loading of wood pellets onto ships for international transport.
-
D.
seaport
chosen
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
E.
coal terminal
A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9eb9248190b20211772621b4bc |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:29 p.m.