Triple

T11185097
Position Surface form Disambiguated ID Type / Status
Subject Archbishop of Canterbury E264645 entity
Predicate instanceOf P0 FINISHED
Object Anglican office C6848 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Anglican office
Context triple: [Archbishop of Canterbury, instanceOf, Anglican office]
  • A. Anglican clerical position chosen
    An Anglican clerical position is an official role within the Anglican Church’s ordained or licensed ministry structure, encompassing responsibilities for worship, pastoral care, administration, and spiritual leadership in a parish or wider ecclesiastical jurisdiction.
  • B. Anglican bishop
    An Anglican bishop is a senior ordained leader in the Anglican Communion responsible for overseeing a diocese, providing spiritual and administrative guidance, and upholding doctrine and liturgy within the church.
  • C. Anglican archbishop
    An Anglican archbishop is a senior bishop within the Anglican Communion who oversees a province or major ecclesiastical jurisdiction, providing spiritual leadership, governance, and representation for the church.
  • D. Anglican cleric
    An Anglican cleric is an ordained minister in the Anglican tradition who leads worship, administers sacraments, provides pastoral care, and upholds the doctrine and discipline of the Anglican Church.
  • E. Anglican episcopal conference
    An Anglican episcopal conference is a formal assembly of Anglican bishops within a particular region or province that meets to coordinate doctrine, governance, pastoral practice, and common mission for the churches under their oversight.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:29 p.m.