Triple
T11184919
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SR 16 (Georgia) |
E264638
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | U.S. Route 441 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 441 | Statement: [SR 16 (Georgia), connectsTo, U.S. Route 441]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 441 Context triple: [SR 16 (Georgia), connectsTo, U.S. Route 441]
-
A.
U.S. Route 441
chosen
U.S. Route 441 is a major north–south U.S. Highway running from Florida to Tennessee, serving as an important regional corridor through several southeastern states.
-
B.
U.S. Route 29
U.S. Route 29 is a major north–south U.S. Highway running from Florida to Virginia, connecting numerous cities across the southeastern and mid-Atlantic United States.
-
C.
U.S. Route 74
U.S. Route 74 is a major east–west U.S. Highway running across the southern part of North Carolina into Tennessee, connecting cities such as Charlotte, Gastonia, and Wilmington.
-
D.
U.S. Route 411
U.S. Route 411 is a U.S. highway running through the southeastern United States, connecting cities in Alabama, Georgia, and Tennessee.
-
E.
U.S. Route 14
U.S. Route 14 is a major east–west U.S. Highway that runs from Chicago, Illinois, across the northern Midwest and Great Plains to Yellowstone National Park in Wyoming.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9dafac8190bd90d2c74f661aa7 |
completed | April 8, 2026, 7:21 p.m. |
| NER | Named-entity recognition | batch_69d7e8abbeac8190ad6e419258999f4e |
completed | April 9, 2026, 5:58 p.m. |
Created at: April 8, 2026, 9:29 p.m.