Triple

T11181855
Position Surface form Disambiguated ID Type / Status
Subject Alcatel Alsthom E264558 entity
Predicate notableSubsidiary P9212 FINISHED
Object Alsthom E813505 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alsthom | Statement: [Alcatel Alsthom, notableSubsidiary, Alsthom]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Alsthom
Context triple: [Alcatel Alsthom, notableSubsidiary, Alsthom]
  • A. Alstom chosen
    Alstom is a French multinational company that designs, manufactures, and services rail transport equipment and systems, including trains, metros, and signaling solutions.
  • B. Alcatel Alsthom
    Alcatel Alsthom was a major French industrial conglomerate active in telecommunications, power generation, and transport infrastructure before being restructured and rebranded as Alcatel.
  • C. Alstom (formerly Bombardier Transportation)
    Alstom (formerly Bombardier Transportation) is a major global rail transport manufacturer known for producing trains, trams, and related railway systems and equipment.
  • D. Systra
    Systra is a global engineering and consulting firm specializing in mass transit and rail infrastructure projects.
  • E. Tractebel
    Tractebel is an international engineering and consulting company specializing in energy, water, and infrastructure projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e8a7f35481909f35feb94ef10e80 completed April 9, 2026, 5:58 p.m.
NED1 Entity disambiguation (via context triple) batch_69e483affa988190bb7dc4f74d8e878c completed April 19, 2026, 7:26 a.m.
Created at: April 8, 2026, 9:29 p.m.