Triple

T11181179
Position Surface form Disambiguated ID Type / Status
Subject Greber Plan for Ottawa E264541 entity
Predicate instanceOf P0 FINISHED
Object urban planning master plan C29334 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban planning master plan
Context triple: [Greber Plan for Ottawa, instanceOf, urban planning master plan]
  • A. urban planning region
    An urban planning region is a designated geographic area within or around a city used to coordinate land use, infrastructure, transportation, and development policies in an integrated manner.
  • B. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • C. urban planning theory
    Urban planning theory is the body of ideas, principles, and frameworks that explain how cities develop, how space is organized, and how planning decisions shape social, economic, and environmental outcomes.
  • D. urban planning unit
    An urban planning unit is a defined spatial or administrative area within a city used as a basic building block for analyzing, designing, and regulating land use, infrastructure, and development policies.
  • E. town planning policy
    Town planning policy is a set of rules and guidelines that shape how land is used and developed in a town to balance social, economic, and environmental needs.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:29 p.m.