Triple

T11168465
Position Surface form Disambiguated ID Type / Status
Subject Bangabandhu Bridge E264215 entity
Predicate instanceOf P0 FINISHED
Object mega project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mega project
Context triple: [Bangabandhu Bridge, instanceOf, mega project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • C. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • D. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • E. big thing
    A "big thing" is any object, entity, or concept characterized by notably large size, scale, or magnitude relative to a given context.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9dafac8190bd90d2c74f661aa7 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:29 p.m.