Triple
T11168465
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bangabandhu Bridge |
E264215
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mega project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mega project Context triple: [Bangabandhu Bridge, instanceOf, mega project]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
public works project
A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
-
C.
military project
A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
-
D.
project
A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
-
E.
big thing
A "big thing" is any object, entity, or concept characterized by notably large size, scale, or magnitude relative to a given context.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9dafac8190bd90d2c74f661aa7 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:29 p.m.