Triple
T11168464
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bangabandhu Bridge |
E264215
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multipurpose bridge |
C29318
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multipurpose bridge Context triple: [Bangabandhu Bridge, instanceOf, multipurpose bridge]
-
A.
multi-span bridge
A multi-span bridge is a bridge structure composed of multiple consecutive spans supported by intermediate piers or supports, allowing it to cross longer distances or multiple obstacles.
-
B.
twin-span bridge
A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
-
C.
movable bridge
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
-
D.
double-decked bridge
A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
-
E.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9dafac8190bd90d2c74f661aa7 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:29 p.m.