Triple

T11157297
Position Surface form Disambiguated ID Type / Status
Subject Leander class E263943 entity
Predicate instanceOf P0 FINISHED
Object Royal Navy warship class C2284 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Royal Navy warship class
Context triple: [Leander class, instanceOf, Royal Navy warship class]
  • A. Royal Navy warship chosen
    A Royal Navy warship is a commissioned naval vessel of the United Kingdom designed, armed, and operated for maritime defense, power projection, and support of national interests at sea.
  • B. Royal Navy destroyer
    A Royal Navy destroyer is a fast, maneuverable warship designed for fleet escort, anti-submarine, anti-air, and surface warfare operations within the United Kingdom’s naval forces.
  • C. Royal Navy submarine class
    A Royal Navy submarine class is a group of submarines built to a common design and set of specifications for service in the United Kingdom’s naval fleet.
  • D. Royal Navy training ship
    A Royal Navy training ship is a vessel designated for the instruction and practical seamanship training of naval recruits, officer cadets, and specialist personnel.
  • E. Royal Navy survey ship
    A Royal Navy survey ship is a specialized naval vessel equipped to conduct hydrographic, oceanographic, and geophysical surveys to produce accurate nautical charts and support safe navigation and maritime operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9ccddc8190868998c8b7beb060 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:28 p.m.