Triple

T11145958
Position Surface form Disambiguated ID Type / Status
Subject PSLV-XL E263670 entity
Predicate instanceOf P0 FINISHED
Object rocket configuration C29283 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rocket configuration
Context triple: [PSLV-XL, instanceOf, rocket configuration]
  • A. rocket booster
    A rocket booster is a powerful propulsion component that provides the initial thrust needed to lift a launch vehicle off the ground and accelerate it through the early stages of flight.
  • B. rocket assembly building
    A rocket assembly building is a large, specialized facility where rocket components are constructed, integrated, and prepared for testing and launch.
  • C. rocket engineer
    A rocket engineer is a specialized aerospace professional who designs, analyzes, tests, and improves rockets and their propulsion systems to ensure safe, efficient, and reliable space or missile missions.
  • D. rocket propellant
    A rocket propellant is a chemical substance or combination of substances that, when burned or otherwise reacted in a rocket engine, produces high-velocity exhaust gases to generate thrust.
  • E. rocket upper stage
    A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9ccddc8190868998c8b7beb060 completed April 8, 2026, 7:21 p.m.
Created at: April 8, 2026, 9:28 p.m.