Triple

T11134304
Position Surface form Disambiguated ID Type / Status
Subject Zwolle railway station E263371 entity
Predicate operatedBy P86 FINISHED
Object Keolis Nederland E27063 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Keolis Nederland | Statement: [Zwolle railway station, operatedBy, Keolis Nederland]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Keolis Nederland
Context triple: [Zwolle railway station, operatedBy, Keolis Nederland]
  • A. Keolis chosen
    Keolis is a major French public transport operator that manages and operates bus, tram, metro, and rail networks in numerous cities worldwide.
  • B. Abellio
    Abellio is a Dutch-based public transport company that operates train and bus services in the United Kingdom and parts of Europe.
  • C. Govia
    Govia is a major British train operating company formed as a joint venture between the Go-Ahead Group and Keolis, running several rail franchises in the United Kingdom.
  • D. Bolloré Group
    Bolloré Group is a French multinational conglomerate best known for its diversified interests in logistics, media, and communications, and for being controlled by the Bolloré family.
  • E. Systra
    Systra is a global engineering and consulting firm specializing in mass transit and rail infrastructure projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9c0ba08190bbd19c217489b755 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7e8347a248190837e8c26f25f553a completed April 9, 2026, 5:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69e441f00d7c8190a8fe8e0c1169e6b0 completed April 19, 2026, 2:46 a.m.
Created at: April 8, 2026, 9:28 p.m.