Triple

T11118502
Position Surface form Disambiguated ID Type / Status
Subject Royal Arches Route E262957 entity
Predicate instanceOf P0 FINISHED
Object multi-pitch rock climbing route C6570 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multi-pitch rock climbing route
Context triple: [Royal Arches Route, instanceOf, multi-pitch rock climbing route]
  • A. multi-pitch climbing route chosen
    A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
  • B. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • C. ridge climb route
    A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
  • D. ice climbing route
    An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
  • E. traditional climbing route
    A traditional climbing route is a rock climb where climbers place and remove their own protective gear in natural features of the rock as they ascend, rather than relying on pre-fixed bolts.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9b46cc8190b19f9f0cc45bf322 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:28 p.m.