Triple
T11117266
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dutch inland waterway network |
E262917
|
entity |
| Predicate | playsRoleIn |
P268
|
FINISHED |
| Object |
North Sea–Mediterranean transport corridor
The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
|
E907270
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Sea–Mediterranean transport corridor | Statement: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North Sea–Mediterranean transport corridor Context triple: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
-
A.
TEN-T Mediterranean Corridor
The TEN-T Mediterranean Corridor is a major trans-European transport route that links southwestern Europe to its eastern Mediterranean regions through a network of key rail, road, and port infrastructures.
-
B.
Adriatic-Ionian transport corridor
The Adriatic-Ionian transport corridor is a major trans-European route that links ports and cities along the Adriatic and Ionian Seas, facilitating regional trade and connectivity between Italy, the Balkans, and southeastern Europe.
-
C.
Atlantic–Mediterranean corridor
The Atlantic–Mediterranean corridor is a major trans-European transport route linking Spain’s Atlantic coast with the Mediterranean region to facilitate freight and passenger movement.
-
D.
north–south European transport corridor
The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
-
E.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: North Sea–Mediterranean transport corridor Triple: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
Generated description
The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: North Sea–Mediterranean transport corridor Target entity description: The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
-
A.
TEN-T Mediterranean Corridor
The TEN-T Mediterranean Corridor is a major trans-European transport route that links southwestern Europe to its eastern Mediterranean regions through a network of key rail, road, and port infrastructures.
-
B.
Adriatic-Ionian transport corridor
The Adriatic-Ionian transport corridor is a major trans-European route that links ports and cities along the Adriatic and Ionian Seas, facilitating regional trade and connectivity between Italy, the Balkans, and southeastern Europe.
-
C.
Atlantic–Mediterranean corridor
The Atlantic–Mediterranean corridor is a major trans-European transport route linking Spain’s Atlantic coast with the Mediterranean region to facilitate freight and passenger movement.
-
D.
north–south European transport corridor
The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
-
E.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9b46cc8190b19f9f0cc45bf322 |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d79af638b08190b7ade5eb0cab6b75 |
completed | April 9, 2026, 12:26 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e441cb16bc81908b5321506f655e38 |
completed | April 19, 2026, 2:45 a.m. |
| NEDg | Description generation | batch_69e44c0606408190819b9d3fd58f818f |
completed | April 19, 2026, 3:29 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69e4510dc55081908f89aab15726b2a8 |
completed | April 19, 2026, 3:50 a.m. |
Created at: April 8, 2026, 9:27 p.m.