Triple

T11117266
Position Surface form Disambiguated ID Type / Status
Subject Dutch inland waterway network E262917 entity
Predicate playsRoleIn P268 FINISHED
Object North Sea–Mediterranean transport corridor
The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
E907270 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Sea–Mediterranean transport corridor | Statement: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Sea–Mediterranean transport corridor
Context triple: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
  • A. TEN-T Mediterranean Corridor
    The TEN-T Mediterranean Corridor is a major trans-European transport route that links southwestern Europe to its eastern Mediterranean regions through a network of key rail, road, and port infrastructures.
  • B. Adriatic-Ionian transport corridor
    The Adriatic-Ionian transport corridor is a major trans-European route that links ports and cities along the Adriatic and Ionian Seas, facilitating regional trade and connectivity between Italy, the Balkans, and southeastern Europe.
  • C. Atlantic–Mediterranean corridor
    The Atlantic–Mediterranean corridor is a major trans-European transport route linking Spain’s Atlantic coast with the Mediterranean region to facilitate freight and passenger movement.
  • D. north–south European transport corridor
    The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
  • E. Pan-European Corridor IV
    Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: North Sea–Mediterranean transport corridor
Triple: [Dutch inland waterway network, playsRoleIn, North Sea–Mediterranean transport corridor]
Generated description
The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: North Sea–Mediterranean transport corridor
Target entity description: The North Sea–Mediterranean transport corridor is a major trans-European transport route that links key North Sea ports with the Mediterranean region via multimodal connections, including extensive inland waterways, rail, and road networks.
  • A. TEN-T Mediterranean Corridor
    The TEN-T Mediterranean Corridor is a major trans-European transport route that links southwestern Europe to its eastern Mediterranean regions through a network of key rail, road, and port infrastructures.
  • B. Adriatic-Ionian transport corridor
    The Adriatic-Ionian transport corridor is a major trans-European route that links ports and cities along the Adriatic and Ionian Seas, facilitating regional trade and connectivity between Italy, the Balkans, and southeastern Europe.
  • C. Atlantic–Mediterranean corridor
    The Atlantic–Mediterranean corridor is a major trans-European transport route linking Spain’s Atlantic coast with the Mediterranean region to facilitate freight and passenger movement.
  • D. north–south European transport corridor
    The north–south European transport corridor is a major trans-European route facilitating long-distance movement of people and goods between northern and southern Europe.
  • E. Pan-European Corridor IV
    Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9b46cc8190b19f9f0cc45bf322 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d79af638b08190b7ade5eb0cab6b75 completed April 9, 2026, 12:26 p.m.
NED1 Entity disambiguation (via context triple) batch_69e441cb16bc81908b5321506f655e38 completed April 19, 2026, 2:45 a.m.
NEDg Description generation batch_69e44c0606408190819b9d3fd58f818f completed April 19, 2026, 3:29 a.m.
NED2 Entity disambiguation (via description) batch_69e4510dc55081908f89aab15726b2a8 completed April 19, 2026, 3:50 a.m.
Created at: April 8, 2026, 9:27 p.m.