Triple
T11101781
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scioto River waterfront |
E262525
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterfront park system |
C18503
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterfront park system Context triple: [Scioto River waterfront, instanceOf, waterfront park system]
-
A.
waterfront public space
A waterfront public space is a shared, accessible area along a body of water designed for recreation, social interaction, and enjoyment of the natural and urban waterfront environment.
-
B.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
C.
waterfront hub
A waterfront hub is a central, mixed-use area located along a body of water that concentrates transportation, commerce, recreation, and social activities to connect people with the waterfront.
-
D.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
E.
river valley park system
chosen
A river valley park system is an interconnected network of parks, trails, and natural areas along a river corridor designed to protect ecosystems, manage floodplains, and provide recreational and scenic opportunities for the public.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:27 p.m.