Triple
T11096393
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agency for the Cooperation of Energy Regulators |
E262388
|
entity |
| Predicate | worksWith |
P398
|
FINISHED |
| Object | ENTSO-E |
E644898
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ENTSO-E | Statement: [Agency for the Cooperation of Energy Regulators, worksWith, ENTSO-E]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ENTSO-E Context triple: [Agency for the Cooperation of Energy Regulators, worksWith, ENTSO-E]
-
A.
ENTSO-E
chosen
ENTSO-E is the European Network of Transmission System Operators for Electricity, a body that coordinates and represents electricity transmission system operators across Europe to ensure reliable and efficient power system operation and market integration.
-
B.
Eurelectric
Eurelectric is the pan-European industry association representing the interests of the electricity sector and power companies across Europe.
-
C.
Tractebel Energia
Tractebel Energia is a Brazilian electric power generation company known for operating large hydroelectric facilities and other energy assets across the country.
-
D.
Enedis
Enedis is the French electricity distribution network operator responsible for managing and maintaining most of France’s public power grid.
-
E.
Endesa
Endesa is a major Spanish electric utility company and one of the leading energy providers in the Iberian Peninsula and Latin America.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d79a0a02cc8190a15df663d4860163 |
completed | April 9, 2026, 12:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e3e7eca9bc8190b43bae081d97d804 |
completed | April 18, 2026, 8:22 p.m. |
Created at: April 8, 2026, 9:27 p.m.