Triple
T11096354
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agency for the Cooperation of Energy Regulators |
E262388
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | energy regulatory organization |
C7386
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: energy regulatory organization Context triple: [Agency for the Cooperation of Energy Regulators, instanceOf, energy regulatory organization]
-
A.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
B.
energy agency
chosen
An energy agency is an organization responsible for planning, regulating, and promoting the efficient, reliable, and sustainable production, distribution, and use of energy resources within a specific region or sector.
-
C.
energy supplier
An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
electricity industry association
An electricity industry association is an organized group that represents and advocates for the collective interests of companies and stakeholders involved in the generation, transmission, distribution, and sale of electric power.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:27 p.m.