Triple
T11096167
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | DG Environment |
E262384
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object | DG ENV |
E262384
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: DG ENV | Statement: [DG Environment, abbreviation, DG ENV]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: DG ENV Context triple: [DG Environment, abbreviation, DG ENV]
-
A.
DG Environment
chosen
DG Environment is the European Commission department responsible for developing and implementing EU environmental policies and legislation.
-
B.
ENVA
ENVA is the ICAO airport code for Trondheim Airport, Værnes, a major international airport serving the Trondheim region in Norway.
-
C.
ENV
ENV is the College of Environmental Design at California State Polytechnic University, Pomona, which focuses on disciplines such as architecture, landscape architecture, and urban and regional planning.
-
D.
FE Environmental
FE Environmental is a discipline-specific version of the Fundamentals of Engineering exam focused on testing knowledge and skills in environmental engineering.
-
E.
DG ENER
DG ENER is the European Commission department responsible for developing and implementing EU energy policy, including security of supply, sustainability, and the internal energy market.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d79a0897188190b6c293b44990b3d4 |
completed | April 9, 2026, 12:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e42d69c8b4819092614e83e855430e |
completed | April 19, 2026, 1:18 a.m. |
Created at: April 8, 2026, 9:27 p.m.