Triple

T11094210
Position Surface form Disambiguated ID Type / Status
Subject Middle Level Main Drain E262333 entity
Predicate instanceOf P0 FINISHED
Object flood defence infrastructure C18289 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: flood defence infrastructure
Context triple: [Middle Level Main Drain, instanceOf, flood defence infrastructure]
  • A. flood control facility chosen
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • C. movable flood barrier
    A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
  • D. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • E. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9a40d88190a373e2c7e48285db completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:27 p.m.