Triple

T11094148
Position Surface form Disambiguated ID Type / Status
Subject M&GN Joint Railway E262331 entity
Predicate endOperation P17360 FINISHED
Object 1959 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1959 | Statement: [M&GN Joint Railway, endOperation, 1959]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endOperation
Context triple: [M&GN Joint Railway, endOperation, 1959]
  • A. finalOperations
    Indicates that an entity is involved in the last or concluding set of actions or processes within a sequence or workflow.
  • B. endEvent
    Indicates that one event or process marks the termination or conclusion of another event or process.
  • C. operationalStatusAtEnd
    Indicates the final operational condition or state of an entity at the conclusion of a specified period or process.
  • D. ceasedOperation chosen
    Indicates that an entity has stopped functioning, operating, or carrying out its activities, typically in a permanent or indefinite manner.
  • E. endOfActivity
    Indicates that a particular activity has reached its completion or final point in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9a40d88190a373e2c7e48285db completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d79a0783e88190aae3d461730c2d70 completed April 9, 2026, 12:22 p.m.
PD Predicate disambiguation batch_69d744185a5881909ba4cf151d1798ec completed April 9, 2026, 6:15 a.m.
Created at: April 8, 2026, 9:27 p.m.