Triple
T11091059
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Avro Type 698 |
E262254
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental jet-powered bomber prototype |
C22947
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental jet-powered bomber prototype Context triple: [Avro Type 698, instanceOf, experimental jet-powered bomber prototype]
-
A.
experimental aircraft
An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
-
B.
prototype bomber aircraft
chosen
A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
-
C.
jet-powered hydroplane
A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
-
D.
jet-powered aircraft
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
-
E.
rocket-powered aircraft
A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:27 p.m.