Triple
T11088211
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bellows Falls Dam |
E262178
|
entity |
| Predicate | isPartOf |
P10
|
FINISHED |
| Object |
Connecticut River hydroelectric system
The Connecticut River hydroelectric system is a network of dams and power stations along the Connecticut River that generate renewable electricity for the surrounding region.
|
E904087
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Connecticut River hydroelectric system | Statement: [Bellows Falls Dam, isPartOf, Connecticut River hydroelectric system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Connecticut River hydroelectric system Context triple: [Bellows Falls Dam, isPartOf, Connecticut River hydroelectric system]
-
A.
Connecticut River navigation system
The Connecticut River navigation system is a network of canals, locks, and improved river channels designed to make the Connecticut River navigable for transportation and commerce.
-
B.
Niagara River hydropower system
The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
-
C.
St. Lawrence–FDR Power Project
The St. Lawrence–FDR Power Project is a major hydroelectric generating facility on the St. Lawrence River that supplies renewable power to New York State and neighboring regions.
-
D.
Holyoke Dam
Holyoke Dam is a historic hydroelectric dam on the Connecticut River in Holyoke, Massachusetts, known for powering the city’s early industrial development.
-
E.
Bellows Falls Dam
Bellows Falls Dam is a hydroelectric dam on the Connecticut River that provides power and helps regulate water flow near the village of Bellows Falls in Vermont.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Connecticut River hydroelectric system Triple: [Bellows Falls Dam, isPartOf, Connecticut River hydroelectric system]
Generated description
The Connecticut River hydroelectric system is a network of dams and power stations along the Connecticut River that generate renewable electricity for the surrounding region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Connecticut River hydroelectric system Target entity description: The Connecticut River hydroelectric system is a network of dams and power stations along the Connecticut River that generate renewable electricity for the surrounding region.
-
A.
Connecticut River navigation system
The Connecticut River navigation system is a network of canals, locks, and improved river channels designed to make the Connecticut River navigable for transportation and commerce.
-
B.
Niagara River hydropower system
The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
-
C.
St. Lawrence–FDR Power Project
The St. Lawrence–FDR Power Project is a major hydroelectric generating facility on the St. Lawrence River that supplies renewable power to New York State and neighboring regions.
-
D.
Holyoke Dam
Holyoke Dam is a historic hydroelectric dam on the Connecticut River in Holyoke, Massachusetts, known for powering the city’s early industrial development.
-
E.
Bellows Falls Dam
Bellows Falls Dam is a hydroelectric dam on the Connecticut River that provides power and helps regulate water flow near the village of Bellows Falls in Vermont.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9a40d88190a373e2c7e48285db |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d799c5008081908f59612243fa4f7a |
completed | April 9, 2026, 12:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e3e7b68ca88190a26ee54eb873c9cf |
completed | April 18, 2026, 8:21 p.m. |
| NEDg | Description generation | batch_69e3f2cafc008190a3504999297f1e4e |
completed | April 18, 2026, 9:08 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69e3f488819081908f9a4225279cde6b |
completed | April 18, 2026, 9:15 p.m. |
Created at: April 8, 2026, 9:27 p.m.