Triple
T11077818
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Portland Transportation Center |
E261912
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intercity bus station |
C6107
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intercity bus station Context triple: [Portland Transportation Center, instanceOf, intercity bus station]
-
A.
bus station
chosen
A bus station is a designated facility where buses arrive, depart, and lay over, providing passengers with areas to board, alight, purchase tickets, and access related transit services.
-
B.
shuttle bus stop
A shuttle bus stop is a designated location where shuttle buses regularly pick up and drop off passengers according to a specific route or service schedule.
-
C.
terminal station
A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
-
D.
train station
A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
-
E.
tram station
A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9983c08190b0ef61603b69feac |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:27 p.m.