Triple

T11073851
Position Surface form Disambiguated ID Type / Status
Subject SCIEX E261814 entity
Predicate instanceOf P0 FINISHED
Object mass spectrometry manufacturer C15161 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mass spectrometry manufacturer
Context triple: [SCIEX, instanceOf, mass spectrometry manufacturer]
  • A. scientific instruments company chosen
    A scientific instruments company designs, manufactures, and supplies specialized tools and equipment used for research, analysis, and measurement in scientific and industrial settings.
  • B. Raman spectrometer
    A Raman spectrometer is an analytical instrument that uses monochromatic light to measure inelastically scattered photons from a sample, providing molecular vibrational information for chemical identification and characterization.
  • C. semiconductor equipment supplier
    A semiconductor equipment supplier is a company that designs, manufactures, and provides specialized tools, machinery, and related services used in the fabrication and testing of semiconductor devices and integrated circuits.
  • D. fluorescence spectrometer
    A fluorescence spectrometer is an analytical instrument that measures the intensity and wavelength distribution of fluorescent light emitted by a sample after excitation with a specific light source, enabling qualitative and quantitative analysis of molecular species.
  • E. spectroscopic instrument
    A spectroscopic instrument is a device that disperses electromagnetic radiation into its component wavelengths and measures their intensities to determine the physical or chemical properties of a sample.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9983c08190b0ef61603b69feac completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:26 p.m.