Triple

T11053828
Position Surface form Disambiguated ID Type / Status
Subject Shields parameter E261323 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering concept C20938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulic engineering concept
Context triple: [Shields parameter, instanceOf, hydraulic engineering concept]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. fluid mechanics concept chosen
    A fluid mechanics concept is an abstract principle or model that describes how fluids (liquids and gases) behave and interact under various forces, motions, and boundary conditions.
  • C. hydrological system
    A hydrological system is the interconnected network of water storage and movement through the atmosphere, land, and water bodies, driven by processes such as precipitation, evaporation, infiltration, and runoff.
  • D. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • E. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa98650481908609c7c56bfa7902 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:26 p.m.