Triple

T11033991
Position Surface form Disambiguated ID Type / Status
Subject Union Square station (Somerville) E260828 entity
Predicate projectPhase P8100 FINISHED
Object Phase 2 of the Green Line Extension E388804 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Phase 2 of the Green Line Extension | Statement: [Union Square station (Somerville), projectPhase, Phase 2 of the Green Line Extension]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Phase 2 of the Green Line Extension
Context triple: [Union Square station (Somerville), projectPhase, Phase 2 of the Green Line Extension]
  • A. Green Line Extension chosen
    The Green Line Extension is a Massachusetts Bay Transportation Authority light rail project that extends Boston’s Green Line service into previously unserved neighborhoods in Somerville and Medford.
  • B. Green Line southern extension
    The Green Line southern extension is a Washington Metro expansion project that extended the Green Line further into the suburbs of Prince George's County, Maryland, adding several new stations beyond its previous terminus.
  • C. North Line extension of Red Line
    The North Line extension of the Red Line is a METRORail light rail expansion in Houston that extends service north from downtown to additional neighborhoods and transit connections.
  • D. Red Line Northwest Extension corridor
    The Red Line Northwest Extension corridor is a planned expansion route of Boston's MBTA Red Line intended to extend rapid transit service northwest from its current terminus.
  • E. Fairmount Line Improvement Project
    The Fairmount Line Improvement Project is a transit infrastructure initiative aimed at upgrading Boston’s Fairmount commuter rail line to provide more frequent, reliable, and accessible service to surrounding neighborhoods.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa979bdc8190bf0e79104cc098c1 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d797e709648190adbb05197e15ff76 completed April 9, 2026, 12:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69e3c8372fac81908c68219b89ba45c1 completed April 18, 2026, 6:06 p.m.
Created at: April 8, 2026, 9:25 p.m.