Triple
T1103120
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Proton Synchrotron Booster |
E25425
|
entity |
| Predicate | postUpgradeInjectionEnergy |
P23134
|
FINISHED |
| Object | 160 MeV |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 160 MeV | Statement: [Proton Synchrotron Booster, postUpgradeInjectionEnergy, 160 MeV]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: postUpgradeInjectionEnergy Context triple: [Proton Synchrotron Booster, postUpgradeInjectionEnergy, 160 MeV]
-
A.
injectionEnergyTo
Indicates the amount of energy transferred or supplied from one entity to another through an injection process.
-
B.
hasUpgrade
Indicates that one entity possesses, includes, or is associated with an improved or enhanced version of another entity.
-
C.
successorEnergy
Indicates that one energy state, configuration, or value directly follows another in a defined sequence or progression.
-
D.
plannedUpgrade
Indicates that an entity has a scheduled or intended improvement or enhancement to be carried out in the future.
-
E.
storesEnergyAs
Indicates that one entity retains or accumulates energy in the form or medium specified by another entity.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49428d4448190b3b36991ceae87ce |
completed | March 1, 2026, 7:31 p.m. |
| NER | Named-entity recognition | batch_69a4b9c375848190baec4d534f489616 |
completed | March 1, 2026, 10:12 p.m. |
| PD | Predicate disambiguation | batch_69a4b7472c848190b0643872f67084a2 |
completed | March 1, 2026, 10:01 p.m. |
| PDg | Predicate description generation | batch_69a4b7da38888190a118ef20ce4ae9aa |
completed | March 1, 2026, 10:04 p.m. |
Created at: March 1, 2026, 7:43 p.m.