Triple

T11026103
Position Surface form Disambiguated ID Type / Status
Subject Huntington station (LIRR) E260622 entity
Predicate electrificationTerminusFor P65516 FINISHED
Object Port Jefferson Branch electric service LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Port Jefferson Branch electric service | Statement: [Huntington station (LIRR), electrificationTerminusFor, Port Jefferson Branch electric service]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationTerminusFor
Context triple: [Huntington station (LIRR), electrificationTerminusFor, Port Jefferson Branch electric service]
  • A. electrificationTerminusOf chosen
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • D. railroadTerminusFor
    Indicates that one location serves as the end point or final station of a particular railroad line for another location.
  • E. railLineTerminus
    Indicates that a rail line ends or terminates at the specified location or station.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9687448190b28d353b1b6a610e completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d797d0cd988190a7b21d7bdc3109ce completed April 9, 2026, 12:13 p.m.
PD Predicate disambiguation batch_69d7440087ac8190aef2e6f6b13b2635 completed April 9, 2026, 6:15 a.m.
Created at: April 8, 2026, 9:25 p.m.