Triple
T11011596
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CERN Control Centre |
E260260
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | control centre |
C2679
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: control centre Context triple: [CERN Control Centre, instanceOf, control centre]
-
A.
central control system
A central control system is a coordinating entity that monitors, manages, and directs the operations of interconnected components or subsystems to achieve overall system objectives.
-
B.
centre
chosen
A centre is a designated facility or focal point where specific activities, services, or operations are coordinated and provided.
-
C.
center
A center is a conceptual class representing a focal point or core location around which other elements are organized, balanced, or oriented.
-
D.
centralized monitoring center
A centralized monitoring center is a dedicated facility that aggregates, analyzes, and manages real-time data and alerts from distributed systems or locations to enable coordinated oversight and rapid response.
-
E.
deployable air command and control centre
A deployable air command and control centre is a mobile, rapidly configurable facility that provides the infrastructure, systems, and personnel needed to plan, direct, and coordinate air operations in a given theater.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa9687448190b28d353b1b6a610e |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:25 p.m.