Triple

T10999635
Position Surface form Disambiguated ID Type / Status
Subject Spectrum Management and Telecommunications program E259971 entity
Predicate instanceOf P0 FINISHED
Object spectrum management program C21884 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spectrum management program
Context triple: [Spectrum Management and Telecommunications program, instanceOf, spectrum management program]
  • A. satellite program
    A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
  • B. regional planning program
    A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
  • C. telecommunications initiative chosen
    A telecommunications initiative is a coordinated project or program aimed at developing, expanding, or improving communication networks and services to enhance connectivity and information exchange.
  • D. operating permit program
    An operating permit program is a regulatory framework that requires facilities to obtain and comply with permits specifying conditions under which they may operate, typically to control environmental, safety, or public health impacts.
  • E. telecommunications regulator
    A telecommunications regulator is a governmental or independent authority responsible for overseeing, licensing, and enforcing rules in the communications sector to ensure fair competition, consumer protection, and efficient use of spectrum and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa8a6a548190a750f944ccdc8064 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:25 p.m.