Triple
T10984755
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pine Portage Dam |
E259599
|
entity |
| Predicate | isPartOfGrid |
P96458
|
FINISHED |
| Object | Ontario power grid |
E325248
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ontario power grid | Statement: [Pine Portage Dam, isPartOfGrid, Ontario power grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ontario power grid Context triple: [Pine Portage Dam, isPartOfGrid, Ontario power grid]
-
A.
Ontario electricity grid
chosen
The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
-
B.
Ontario Hydro
Ontario Hydro was the former publicly owned electric utility in Ontario, Canada, responsible for generation and transmission of electricity before its restructuring into successor companies.
-
C.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
D.
Atlantic Canada electricity system
The Atlantic Canada electricity system is the interconnected regional power network that supplies and transmits electricity across the eastern Canadian provinces, integrating major generation projects like Muskrat Falls.
-
E.
Ontario hydroelectric system
The Ontario hydroelectric system is a network of dams, generating stations, and related infrastructure that harnesses the province’s rivers and waterways to produce renewable electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isPartOfGrid Context triple: [Pine Portage Dam, isPartOfGrid, Ontario power grid]
-
A.
roleInGrid
Indicates the specific function or position an entity occupies within a structured grid or matrix.
-
B.
hasStreetGridPattern
Indicates that an area’s street layout follows a structured, grid-like pattern of intersecting roads.
-
C.
hasPartIn
Indicates that an entity participates in or plays a role within a larger event, process, or composite entity.
-
D.
gridType
Indicates the specific structural or organizational pattern of a grid used to arrange or reference elements.
-
E.
hasLightingGrid
Indicates that an entity is equipped with or connected to a structured lighting grid system.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa895f4c8190887a15460ef622f4 |
completed | April 8, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69d772ed1eb88190b7333b746f76a088 |
completed | April 9, 2026, 9:35 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e344d860b08190a035570191c54d7c |
completed | April 18, 2026, 8:46 a.m. |
| PD | Predicate disambiguation | batch_69d72e9055908190b438f039574aaaaf |
completed | April 9, 2026, 4:44 a.m. |
| PDg | Predicate description generation | batch_69d732242fdc8190be77d1f730a42935 |
completed | April 9, 2026, 4:59 a.m. |
Created at: April 8, 2026, 9:24 p.m.