Triple

T10984086
Position Surface form Disambiguated ID Type / Status
Subject Subashiri Trail E259582 entity
Predicate instanceOf P0 FINISHED
Object mountain climbing route C23418 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mountain climbing route
Context triple: [Subashiri Trail, instanceOf, mountain climbing route]
  • A. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • B. ridge climb route chosen
    A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
  • C. ice climbing route
    An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
  • D. alpine climbing route section
    An alpine climbing route section is a distinct segment of a high-mountain ascent characterized by specific terrain, difficulty, and required techniques within the overall route.
  • E. multi-pitch climbing route
    A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa895f4c8190887a15460ef622f4 completed April 8, 2026, 7:20 p.m.
Created at: April 8, 2026, 9:24 p.m.