Triple
T10984040
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Reitdiep |
E259581
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canalized river |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canalized river Context triple: [Reitdiep, instanceOf, canalized river]
-
A.
river meander
A river meander is a naturally occurring, sinuous bend or curve in a river channel formed by the lateral erosion and deposition of sediment over time.
-
B.
river distributary
A river distributary is a branch of a river that diverges from the main channel and flows away from it, typically found in delta regions where sediment deposition causes the river to split into multiple smaller channels.
-
C.
river corridor
A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
-
D.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
E.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa895f4c8190887a15460ef622f4 |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:24 p.m.