Triple
T10963179
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Forward |
E259027
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | campaign theme |
C1719
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: campaign theme Context triple: [Forward, instanceOf, campaign theme]
-
A.
campaign
A campaign is a coordinated series of planned actions and communications designed to achieve a specific objective, such as influencing opinions, driving engagement, or accomplishing a strategic goal over a defined period.
-
B.
campaign committee
A campaign committee is an organized group responsible for planning, financing, and managing the activities of a political or advocacy campaign to achieve specific electoral or policy goals.
-
C.
political campaign slogan
chosen
A political campaign slogan is a concise, memorable phrase used by a candidate or party to communicate core values, priorities, or promises and to persuade and mobilize voters.
-
D.
political campaign logo
A political campaign logo is a visually distinctive symbol or design that represents a candidate or movement’s identity, values, and message across campaign materials.
-
E.
public campaign
A public campaign is a coordinated set of communication and outreach activities designed to inform, persuade, or mobilize a broad audience around a specific social, political, or commercial issue.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aa88500c819097d7032ca578e74f |
completed | April 8, 2026, 7:20 p.m. |
Created at: April 8, 2026, 9:23 p.m.