Triple

T1095846
Position Surface form Disambiguated ID Type / Status
Subject Isotope Separator On-Line Device E24269 entity
Predicate instanceOf P0 FINISHED
Object ISOL facility C63 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ISOL facility
Context triple: [Isotope Separator On-Line Device, instanceOf, ISOL facility]
  • A. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • B. research facility chosen
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • C. fusion energy research facility
    A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
  • D. enclave
    An enclave is a distinct, self-contained area or community that is geographically, culturally, or functionally separated from its surrounding environment while remaining embedded within it.
  • E. CERN accelerator complex component
    A CERN accelerator complex component is a specialized physical or control-system element—such as magnets, RF cavities, beamlines, detectors, or power and cooling infrastructure—that collectively enables the production, acceleration, steering, and monitoring of particle beams for experimental research.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4940542308190ac2a0b1f730b7cfc completed March 1, 2026, 7:31 p.m.
Created at: March 1, 2026, 7:42 p.m.